DEPENDABILITY 04 – Module 02 • Integrated Logistics Support & Maintenance Cost
Duration:
2 days
Price:
Distance learning: 1400 € ex-tax
Face to face learning: 1600 € ex-tax
Location:
Contact us
Objectives
At the end of the training, the trainee will:
Have sufficient knowledge to draft and evaluate the associated ILS/ASL performance clauses.
Program
Day 1
This training module is based on concrete and interactive examples with the trainees.
It focuses on the main evaluation components
Introduction
- Introduction to ILS/LSA/MOC
- Norms and standards (ECSS, MIL STD, DEF STAN, NF, EN)
- Maintenance concept
- Support concept
- Life cycle (System/Support)
- ILS management: coordination of ILS activities, link with other concerned actors, ILS Plan, Training Plan Documentation, Plan, Operational and Maintenance Plan, Configuration Management Plan, …
Systems Engineering
- Systems architecture and ILS activities
- ILS/LSA & RAMS performance
- The V&V process
Performance Reliability & Testability (MTBF, MTTF)
- RAMS studies, FMECA and its use for maintenance engineering
- Reliability / maintainability indicators: MTBF, MTTR,MUT, MDT,
- How to deal with NFF…
Support Engineering / Maintainability
- Maintenance tasks (Scheduled, unscheduled)
- Maintenance plan
- Testability assessment
- Influence of maintainability on the components of maintenance: operating cost and concept of maintenance
- Software maintenance
- Influence of human factors (maintenance procedure follow-up / human maintenance processes / human errors)
- Reliability Centered Maintenance (RCM) concept
Day 2
Logistics Support Analysis (LSA)
- Logistic tree structure
- Tools, standards (BASL)
- LSA components (TAT logistics, MTTR, spares/stock)
- Impact of obsolescence
- Elements of a Total Cost of Ownership model (TCO or LCC)
- LORA study
Availability and REX
- Availability assessment (inherent)
- Influence of experience feedback and capitalization of experience in operational/in-service reliability
Logistic support elements (ILS elements)
- Technical documentation (applicable standards)
- Spare parts (evaluation principle)
- Packaging, transport (PHS&T function)
- Training of maintenance operators (evaluation of the need)
- Technical assistance (contractual approach)
- Configuration management.
Operational readiness maintenance contracts
(MOC) contracts
- Essential elements to draw up an MOC CONTRACT
Assessment of knowledge: questionnaire
Dedicated to
- Project Manager
- Buyer
- Dependability Engineer
- Maintenance engineer
Prerequisites
Dependability02 – Module 01 – RAM studies