NS 09 • Functioning and operation of nuclear power plants
Understand the French nuclear fleet and the operation of a nuclear power plant
Duration:
Rate (per trainee):
Face to face learning: 1600 € ex-tax
Location:
Contact us
Objectives
- Understand the challenges of the French nuclear power generation system.
- Understand the general operation of a nuclear power plant, the involved technologies through the main components.
- Understand the principles of nuclear energy and its monitoring.
At the end of the training, the trainee will:
- Be familiar with the French nuclear park and its stakes.
- Be able to list the main parameters to manage a power plant.
- Be able to explain the operation of a power plant.
Program
Day 1
The French nuclear fleet
- Locations
- Specifications of the nuclear power plants
- Operating issues
General operation
- Nuclear energy: principles of production and operation
- Description of a pressurized water reactor plant with its main components
- Parameters of a nuclear reactor control
- Instrumentation and monitoring
Day 2
Operation of a nuclear power plant
- Organization of the operation and articulation of maintenance operations
- Crisis organization
- Associated documentation
Day 3 (OPTIONAL)
Case study
- Simulation of a dysfunction
- Crisis organization
- Understand the impacts
- Reactions – role-playing.
Assessment for learning: quiz
Dedicated to
- Program Manager
- Technical Manager
- Project Manager
- Business Manager
- Design office Engineer
- Consultants
Prerequisites
Engineer or senior technician training.